Skip to page body Home I Want to... What's New City Services Living Doing Business Visiting About Pittsburg
News Review
Tesoro Pittsburg Terminal Deconstruction Project - Notice of Intent
Public Comment Period Now Open
Posted Date: 3/5/2019

Project Name: Tesoro Pittsburg Terminal Deconstruction Project    
Location: Intersection of East 3rd and Harbor Streets (APNs: 073-010-011; -007; and -013).
 NOI File Date: March 5, 2019

Notice of Intent (NOI) to consider adoption of a Mitigated Negative Declaration (MND)

NOW AVAILABLE FOR PUBLIC COMMENT

Notice is hereby given that the City of Pittsburg finds that no significant effect on the environment, as prescribed by the California Environmental Quality Act of 1970 (CEQA), as amended, will occur for the proposed Tesoro Pittsburg Terminal Deconstruction Project, as described below.  Please follow the link above for a downloadable copy of the full Initial Study.

Project Description: This is a request for approval to deconstruct and remove the existing marine terminal located along the shoreline of New York Slough, as part of the termination of Tesoro’s lease with the City of Pittsburg. The vast majority of the deconstruction work would occur “waterside” via marine vessels to be staged adjacent to the existing terminal (dock). The purpose of the proposed deconstruction is to remove the decrepit and unused terminal as a condition of terminating Tesoro’s lease with the City of Pittsburg, and would include removal of the platform, fender system, all dolphins, walkways, decks, piles and one small building.  There is no construction associated with the Proposed Project.